Leaky Building Inspections and Repairs, Costed Before You Commit
For building owners, property managers and body corporates: we test until we know how far the damage really goes, then show you the worst case upfront, so the number doesn’t grow once the cladding comes off.
Book a ConsultationOr call +64 22 497 0421. We reply the same business day.
What does a leaky building inspection tell you before you commit to repairs?
Where water is actually getting in, how far it has travelled into the framing, and whether a targeted repair or a full reclad is the right fix. We combine moisture mapping, invasive checks and AAMA 511 water testing to find out, then price the job with hidden damage shown as its own worst-case line — so you know that number before you’ve signed anything.
Why do leaky building repairs go wrong for owners and body corporates?
Usually not because of the leak itself. Budgets blow out when hidden framing damage turns up after the contract is signed, committees stall when they’ve got no evidence to put in front of owners for the scope and levy, and value suffers when a repair can’t be proven. All three trace back to the same mistake: deciding before you actually know the facts.

The number you can’t see yet
Most leaky building budgets blow out for one reason: framing damage nobody could see until the cladding came off. By then the scaffolding is up, the contract is signed, and every surprise arrives as a variation.
Owners who have to agree
A committee has to put a scope and a levy to owners, some of whom may have paid for repairs before, and defend it at a general meeting. Opinion doesn’t survive that room. Test results do.
A stigma that outlasts the repair
Massey University research found properties from the leaky-building era can sell for up to 21 per cent less, and the discount doesn’t fully disappear after repair. A documented, evidence-based repair is what lets a building shed the label.
How does Aamsko inspect and repair a leaky building?
Four steps, always in this order. Test the building first, scope the least invasive repair that will actually last, cost it with the worst case sitting right next to the base number, then see it through to Code Compliance. We don’t recommend anything until the testing tells us what’s really failing.

- Step one
Inspect and test
We run an external and rope-access survey, thermal imaging, moisture mapping, invasive checks wherever the readings point, and AAMA 511 water testing — to trace the path the water’s actually taking, which is often nowhere near where the damage shows up.
- Step two
Scope the least invasive fix that will last
Sometimes that’s a full reclad. Often it’s targeted work on flashings, membranes, joinery junctions or coatings. The test results decide, not a default assumption that everything has to come off.
- Step three
Cost it with the worst case in plain sight
You get a base estimate plus a clearly labelled contingency for hidden framing damage, before you commit to anything. Once the framing’s exposed, we confirm the real extent by inspection and true the contract sum up to what’s actually measured, not what was guessed.
- Step four
Deliver and document through to Code Compliance
We coordinate council inspections, producer statements and Licensed Building Practitioner sign-off across every trade, in sequence. Every stage gets photographed and dated, so owners, insurers and future buyers can see exactly what was done — and a warranty claim years later is something you can prove, not argue.
For body corporates and property managers: we report against the budget at every payment milestone, in a form you can put straight in front of owners without translating it first.
What have leaky building inspections found on real Auckland buildings?
Often that the suspected cause was wrong. On the three Aamsko projects below, testing either cleared the part everyone blamed or found problems nobody had suspected, which changed the repair and the budget before work began and before owners were asked to fund it.
Harbour Royal Apartments
- Suspected
- The windows
- Found
- Corbel ledges and flashings never installed
An eleven-storey body corporate building. The windows were the suspected culprit. Water testing proved they weren’t: the leaks traced to corbel ledges and flashings that had never been installed, so the repair targeted those instead.
Case study
128 Broadway
- Problem
- Water tracking down several levels
- Found
- Failed jamb and head flashings
A fully tenanted commercial office building with water tracking down through several levels. Testing isolated failed jamb and head flashings, and the retrofit flashing design fixed them without replacing the windows.
Case study
Albert Street
- Suspected
- Joinery failures
- Found
- Problems well beyond the joinery
An office building before its conversion into what is now the DoubleTree by Hilton Auckland Albert Street. Investigation showed the problems went well beyond the joinery failures previously suspected, found before the refurbishment budget was locked in, not after.
Case study
We’ve never delivered a project over the budget we scoped.Aamsko · Auckland, New Zealand · Since 2016
Aamsko is an Auckland building consultancy and project management firm, working out of Level 1, 30 Broadway, Newmarket, since 2016. We handle leaky building inspections, weathertightness testing, remediation design, quantity surveying, consents and project management for building owners, property managers and body corporates right across Auckland and New Zealand — backed by a team whose qualifications span architecture, architectural technology and law.
Find out what you’re really dealing with
What happens when you get in touch:
- i.Same-day replyWe reply the same business day.
- ii.A preliminary consultationWe book a one-hour initial consultation with our building consultant, for a fixed fee of $95, including GST.
- iii.No surprisesIf testing is needed, you get its scope and cost in writing before it starts. Nothing proceeds until you approve it.
Book a consultation
Tell us about the building. It takes under a minute.
Prefer to talk it through? Call +64 22 497 0421
Leaky building repairs and inspections, answered
Straight answers on cost, process and what to expect.
Book a ConsultationDoes a leaky building always need a full reclad?
Not always. A full reclad is one possible outcome — it’s not where we start. We inspect the cladding and framing, test for the real extent of the moisture and damage, and only then work out the repair. Sometimes that’s targeted remedial work, sometimes it’s a full reclad. The evidence decides, not a default assumption.
What does a leaky building inspection involve?
An external survey, thermal imaging and moisture mapping, followed by invasive checks and AAMA 511 water testing wherever the readings point. The aim is to trace the path water is actually taking, which is often not where the damage shows. In Auckland that usually means starting with monolithic cladding, joinery junctions, parapets and balconies.
How much does a leaky building inspection cost?
Aamsko starts with a one-hour initial consultation with a building consultant, for a fixed fee of $95 including GST. If testing is needed, its scope and cost are confirmed in writing before any work starts, because the right level of testing depends on the building’s size, its cladding and the damage already visible.
What’s the difference between a leaky home inspection and a full weathertightness assessment?
A leaky home inspection is the first, targeted step: checking visible signs of water ingress and testing moisture levels at the junctions and penetrations most likely to be failing. A full weathertightness assessment goes further, opening up framing where the inspection points to a problem, to confirm the actual extent of damage before any repair is scoped.
How much does recladding cost in Auckland?
For a typical three-bedroom Auckland house, a full reclad usually costs between $120,000 and $500,000. The biggest variable is hidden framing damage found once the cladding comes off, so Aamsko shows a worst-case contingency for it separately from the base estimate. Apartment and commercial buildings are scoped and priced building by building.
What does Aamsko charge to manage a leaky building repair or reclad?
Our project management and contract management, including securing warranties, is 8% of the project value, plus GST. It’s a percentage, so the fee moves with the real contract value — down as well as up, if costs land below budget.
Why do leaky building repair costs blow out once work starts?
It’s almost always hidden framing damage found once the cladding is removed, not the visible problem you started with. Aamsko prices for that possibility upfront, with a clearly labelled contingency separate from the base estimate, and confirms the actual extent of hidden damage by inspection once framing is exposed. You see the true number as soon as it’s known, not at the end.
Which Auckland buildings are most likely to have leaky building problems?
If your building went up between about 1988 and 2004, take it seriously — especially with monolithic cladding like plaster or EIFS finishes, untreated timber framing, minimal eaves, parapets or enclosed balconies. It’s not just houses, either: apartment and commercial buildings from that era carry the same exposure. And a building outside that window can still leak, which is exactly why testing matters more than the build date.
How can a body corporate get owners to agree on a leaky building repair?
Give owners evidence rather than opinion. They’re far more likely to approve a scope and a levy when they can see test results showing what’s failing, the repair options costed side by side, and the worst case stated upfront. Aamsko prepares that evidence in a form a committee can present at a general meeting, then reports against it at every payment milestone once work starts.
How do you document a leaky building repair for warranty, insurers and future buyers?
Aamsko photographs and dates every inspection stage, covering cladding, flashings, joinery and membrane installation, so a warranty claim can be evidenced years later rather than disputed between a supplier and a builder. That record becomes part of what you hand to insurers, future buyers or your body corporate, not just something kept on file.
© 2026 Aamsko. All rights reserved. Level 1, 30 Broadway, Newmarket, Auckland 1023, New Zealand.


Level 1, 30 Broadway